ISO 9001:2015

We have achieved the ISO 9001:2015 accreditation!!

After a difficult start to the year we have successfully achieved implementation of the ISO 9001:2015 Quality management standard For Lee-Brothers!

bsi

The Nigel Doughty academy

20160907_13532220160907_135744
20160907_135918

 

 

 

 

 

 

 

We successfully manufactured and installed this 10m high ballstop netting for Nottingham forest football club within a  14 day period, From manufacture/design to install we can work with you to complete on a tight deadline.


Ipswich town training centre

Work commenced on new 3 & 5m High Twinbar fencing being installed around the clubs 7-a-side training pitch being installed by SIS Pitches.

We have worked with SIS to manufacture the division net system to their exact requirements, and hope to have this full size pitch installed and be offsite within 8 days, including snagging.IMG-20160630-WA0004


The Lakes College, West Cumbria

Currently closing the Fencing at The lakes college, Cumbria – a Rugby & Football Pitch with our twin bar system 8 metres High facing the Main road. A Thornton sports contract.

 

20160112_132647
20160112_132600